There are some signs of change on Saint George Court. If the big blue dumpster in our yard wasn't a clue then the long parade of workmen that moves up our driveway at 7:00am should be.
This week workers began replacing all eaves, soffit and fascia boards. This is necessary to complete before the roofers arrive.



We are also replacing the timbers on the stucco areas of our house at the same time. All material used in these areas is Azek. A man made material, it is only available in white. As you know from prior blogs we are switching up the color palette on our tudor. Watch as the timbers are replaced with white and the background of the house goes darker.All woodpecker damage will be repaired as these conversions are completed. see right
Work on the rear of the house is like climbing a wall.The sheer expanse of the house is a challenge. By midweek our crew was up to the peak with staging. Friday afternoon they had turned the corner and were working on the east exposure, by the pond.
This side had the heaviest damage from the birds
and will be completed on Monday.
March 21, 2014